Allied Springfield Concrete Construction

Concrete floor installation in Springfield IL - a level surface that holds up to wear

Cracked, dusty or uneven floor in your basement or shop? We pour a new one and time every step so it lasts.

Request an estimate
Polished gray concrete floor in an open kitchen and living area, reflecting light from tall windows beside a fireplace.

What goes into a new concrete floor in Springfield?

Concrete floor installation in Springfield means placing a new slab indoors or under cover, then finishing, jointing and curing it, so you end up with a level surface that holds up to wear and drains the way it was planned.

Most of the floors I'm asked about are in basements, workshops, sheds and additions, where the old slab has cracked, sunk or gone dusty, or where there's only dirt or gravel today. The price comes down mostly to the size of the floor, how much digging and base work the ground needs, whether the slab is reinforced and what's going on top of it. The schedule turns on how easily we can get materials and the concrete into the space, the weather on pour day and how long the slab has to rest before you use it. If the job is a garage, our garage floor concrete page goes into that work. I'd like you to know exactly what you're paying for before we start, so when I come out I measure, look at the ground and put each part of the job in writing.

How we handle concrete floor installation

We start underneath, because that's where most of the failed slabs I used to repair went wrong. Our crew digs out soft soil and packs the subgrade, the ground the slab rests on, so the floor doesn't settle with the dirt later. If a covering is going on top, we lay the vapor layer, a sheet that holds back moisture rising from the ground, and keep it whole by patching any tear before the pour. Where the plan calls for it, we set rebar, the steel that helps hold the slab together, then place the concrete and finish it. From there an indoor floor comes down to timing, so we watch the concrete and decide when to trowel it smooth, when to cut the control joints, the shallow cuts that give cracks a straight place to form, and when to start curing, the slow, damp rest that lets concrete gain its strength. If the budget has to give somewhere, I'd rather you spend it on the base than on a fancier surface, because a top can be refinished later but bad ground means tearing the floor out.

A new floor often has other concrete around it. When the space sits above the yard, we can build concrete steps at the door during the same job, and if it opens onto a pool, our concrete pool decks get the same care with the base and the drainage.

  • A finished concrete floor

    This suits shops, storage rooms and utility spaces where the concrete is the floor you'll live with. We trowel it smooth and dense so it's easy to sweep and stands up to carts, tools and foot traffic.

  • A slab ready for flooring

    This suits basements and additions that will get tile, vinyl, wood or carpet. We put extra care into keeping the vapor layer whole and the surface flat, because moisture and high spots are what ruin coverings later.

Concrete floor installation and the ground in Springfield

Springfield's Building & Zoning Department issues building permits, and if your property sits in a floodplain, the city's floodplain development permit has to come first. Whether your floor needs a permit is the city's call, so we check what the office asks for at your address and take care of the paperwork for our work when a permit applies. The city's permit also makes no promise that your land suits the project, and it leaves soil compaction and mine subsidence research, a check for ground sinking over old mines, with you as the owner and with whoever applies. The Illinois Department of Natural Resources has more on that research at 217-782-0588. I look closely at the ground on my first visit and let you know early about anything the office will ask of you.

Many of the floors we see here are in older houses and outbuildings where the first slab went down over loosely filled ground, so we plan on digging out and repacking more than the surface suggests. We meet the same kind of floors on jobs in Chatham and Decatur, and we work across the cities around Springfield, so if yours isn't listed, please ask about your address.

Get a written estimate for your new concrete floor

Send us the floor's size in square feet, where it is and any covering you plan to put on it, and we'll reply within one business day. I'll then come out, look at the space and the ground, and write a free estimate on site, with no obligation to go ahead.

(217) 210-0810

Concrete floor questions from Springfield homeowners

How much does a concrete floor cost in Springfield, IL?

A concrete slab in Springfield usually costs about $6 to $12 per square foot, which is the going rate around here and not a quote from us. A reinforced slab runs more per square foot than a plain pad, and staining or stamping falls outside that usual range. I'll give you your own figure in writing once I've seen the space and the ground.

Will my new concrete floor crack?

Some cracking should be expected in any concrete floor, so the aim is to keep cracks tight and put them where we choose. Properly sized and placed reinforcement keeps cracks closed rather than stopping them, and the control joints described above give them a straight line to follow. Industry guidance calls the timing of finishing, jointing and curing critical, since poor timing can lead to cracks, a powdery top, flaking and edges that curl up, so ask any crew you talk to, us included, how they time those steps.

How long does a new concrete floor take before I can walk on it?

A new slab should be ready to walk on within 48 hours, though concrete takes a month to fully cure. To be safe, many owners wait a week before rolling heavy tools, appliances or shelving onto it, and we'll tell you when your floor is ready for each step.

How do I protect flooring over a new concrete slab?

Start with a vapor layer under the slab, because a layer that holds back ground moisture protects coverings and coatings best when it sits in direct contact with the concrete. Even small holes in it can sharply raise the moisture coming through, which is why we keep ours whole before the pour. Tell me what flooring you have in mind so we can plan the slab around it.

Who handles building permits for a concrete floor in Springfield?

Springfield's Building & Zoning Department takes permit applications at 300 S. 7th St., Room 304, and as noted above, we handle the paperwork for our work when a permit applies. For building code questions about your address, the state's building agency points owners to their local code officials, so that office is the right place to ask.

Can you pour a concrete floor in winter in Springfield?

Yes, concrete placed in cold weather still gains enough strength and durability when it's properly proportioned, produced, placed and protected. Industry guidance counts it as cold weather once the air drops, or is expected to drop, to 40°F or below while the fresh concrete still needs protection. Fuel heaters need watching too, because the carbon monoxide in their exhaust can leave a powdery surface on concrete less than 24 hours old, so I'll explain how we'll handle heat and exhaust before any winter pour.

Plan your Springfield concrete floor now

Call (217) 210-0810 before the walls, plumbing or flooring are settled, so we can plan the slab around them instead of working around them later.

(217) 210-0810
(217) 210-0810Request an estimate